2024 Exploration
- Soil geochemical survey identified strong copper-in-soil anomaly at Poplar South
- Direct Current Induced Polarization (DCIP) ground geophysical survey identified a strong IP chargeability anomaly
- The presence of overlapping geological, geochemical and geophysical anomalies strongly supports the high-prospectivity for porphyry-related mineralization across this area
- Currently designing a drill program to systematically test the Poplar South target in 2025.

Exploration Prior to Vizsla Copper Aquisition
Vizsla Copper acquired the Poplar project from Universal Copper in February 2024, previous drill programs by UNV in 2019 and 2021 focused on increasing resources at depth and to the west of the property, outlining nine high-priority targets.
Drilling highlights from 2021 include drill hole 21-PC-131, which intersected 432m @ 0.42% Cu, 0.15 g/t Au from 2.2m, and drill hole 21-PC-133, which intersected 479.8m @ 0.41% Cu, 0.13 g/t Au from 21.25m.

2019 Drill Results
Hole-ID |
M From |
M To |
M Interval |
% Cu |
% Mo |
g/t Au |
g/t Ag |
18-PC-126 |
23.5 |
404.47 |
380.97 |
0.365 |
0.015 |
0.10 |
2.31 |
374.3 |
404.47 |
30.17 |
0.554 |
0.027 |
0.15 |
4.44 |
18-PC-127 |
5.5 |
270.36 |
264.86 |
0.421 |
0.013 |
0.10 |
2.63 |
24.40 |
78.00 |
53.60 |
0.552 |
0.025 |
0.14 |
1.73 |
51.00 |
78.00 |
27.00 |
0.643 |
0.030 |
0.15 |
2.62 |
18-PC-128 |
5 |
422.76 |
417.76 |
0.197 |
0.001 |
0.07 |
3.03 |
122.80 |
273.90 |
151.10 |
0.330 |
0.002 |
0.12 |
3.46 |
19-PC-129 |
48.8 |
538 |
489.2 |
0.362 |
0.012 |
0.11 |
2.22 |
143.18 |
538 |
394.82 |
0.413 |
0.013 |
0.12 |
2.27 |
48.8 |
143.18 |
94.38 |
0.152 |
0.008 |
0.04 |
2.06 |
143.18 |
230.36 |
87.18 |
0.259 |
0.011 |
0.08 |
2.12 |
230.36 |
487.97 |
257.61 |
0.488 |
0.016 |
0.14 |
2.42 |
487.97 |
538 |
50.03 |
0.324 |
0.002 |
0.12 |
1.92 |
2021 Drill Results
Hole-ID |
M From |
M To |
M LENGTH |
% Cu |
% Mo |
g/t Au |
g/t Ag |
cuEQ* |
21-PC-131 |
2.20 |
435 |
432 |
0.42 |
0.01 |
0.15 |
1.80 |
0.57 |
21-PC-131 |
242 |
318 |
76 |
0.51 |
0.01 |
0.18 |
2.74 |
0.68 |
21-PC-132 |
5.65 |
192 |
186.35 |
0.436 |
0.019 |
0.1 |
1.72 |
|
21-PC-133 |
21.25 |
501 |
479.75 |
0.408 |
0.013 |
0.13 |
2.89 |
|
21-PC-134 |
27 |
90 |
63 |
0.47 |
0.00 |
0.13 |
2.66 |
0.57 |
21-PC-134 |
225 |
270 |
45 |
0.39 |
0.00 |
0.10 |
3.81 |
0.49 |
21-PC-134 |
247.25 |
315.5 |
68.25 |
0.655 |
0.016 |
0.167 |
2.92 |
|
21-PC-134 |
315 |
351 |
36 |
0.36 |
0.00 |
0.11 |
1.85 |
0.44 |
21-PC-134 |
420 |
501 |
81 |
0.34 |
0.00 |
0.08 |
2.35 |
0.41 |
21-PC-135 |
258 |
336 |
78 |
0.390 |
0.000 |
0.13 |
12.01 |
0.554 |
21-PC-135 |
369 |
498 |
129 |
0.546 |
0.001 |
0.15 |
6.94 |
0.685 |
21-PC-135 |
5.3 |
498 |
492.7 |
0.288 |
0.001 |
0.09 |
4.16 |
0.374 |
21-PC-136 |
237 |
282 |
45 |
0.430 |
0.002 |
0.17 |
3.81 |
0.561 |
21-PC-136 |
345 |
369 |
24 |
0.514 |
0.001 |
0.19 |
6.86 |
0.678 |
21-PC-136 |
417 |
432 |
15 |
0.375 |
0.005 |
0.09 |
3.26 |
0.470 |
*Copper equivalents based on the following: copper US$9,972.10 per tonne, gold US$1,816.60 per ounce, silver US$22.90 and molybdenum US$41,836.39 per tonne