TSXV: VCU

OTC: VCUFF

Home

3

Projects

Palmer VMS Project

Alaska, USA

Poplar Porphyry Project

BC, Canada

Additional Projects

Woodjam Project

BC, Canada

Copperview Project

BC, Canada

Redgold Project

BC, Canada

News

Media

Contact

Poplar
Project

On this page

Project Overview

Location

Access & Infrastructure

Historical Resource Estimate

Exploration Targets

Thira Alteration Corridor

Photo Gallery

Active Copper Porphyry Discovery
in an Established Mining District

Location

Central British Columbia, Canada,
55 km east of Williams Lake

Deposit type

Porphyry-related Copper, Molybdenum, Gold, Silver

Land Package

~47,000 ha (~470 km²)

Ownership

Right to earn a 100% interest by December 2027

Historical investment

40,000+ m of historical drilling, equivalent to nearly $14M today

KEY DISCOVERY

Home to the Thira Cu-Mo discovery, identified in 2025

Commodities
Project Stage

Advancing New Discovery
& Historical Resource Estimate

Phase 1 Complete

11,200 m

Drill Program

Phase 2 Advancing: up to 8,000 m of two-rig drilling planned to test extensions at all three target areas.

Located in an Established 

Copper District

Central British Columbia

Located approximately 40 km south of Houston, B.C., within a large, underexplored porphyry district.

Skeena Arch Geological Setting

Positioned within the Skeena Arch, a region known for significant Cu, Au, Ag and Mo mineralization.

Established Mining District

Near the former Huckleberry Copper and Equity Silver mines, as well as Surge Copper’s Berg deposit.

*Mineralization at Berg Deposit, Huckleberry Mine, Equity Silver or other nearby or regional projects is not necessarily indicative of mineralization at the Poplar Project. Click here to see sources for peer company information.

Established Access and Regional Infrastructure

Direct Road Access

Huckleberry’s former concentrate haul road crosses the property, providing established access through the project area.

Power on the Property

A 138 kV transmission line traverses the project, supporting exploration activities and future development potential.

Regional Transport Corridor

Historical concentrate haulage from the Huckleberry Mine used roads crossing the Poplar project to access regional transport infrastructure.

Established Historical Estimate 
and Active Exploration

The Poplar Project has seen multiple segments of historic exploration including 1974 to 1982, 1992, 2005, 2009 to 2013.

152.3 Mt at 0.43% CuEq

INDICATED HISTORICAL RESOURCE ESTIMATE¹

139.3 Mt at 0.39% CuEq

INFERRED HISTORICAL RESOURCE ESTIMATE¹

¹ Poplar Historical Estimate, Sep 8, 2021. Historical estimate only. A Qualified Person has not done sufficient work to classify the Poplar historical estimate as a current mineral resource or mineral reserve, and Vizsla Copper is not treating it as current. CuEq = Cu US$4.00/lb, Mo US$15.00/lb, Au US$1,800/oz, Ag US$20/oz. Click here for more information & notes on Poplar Historical Estimate.

Overlapping Anomalies Define an >8 km Priority Corridor

¹ Poplar Historical Estimate, Sep 8, 2021. Historical estimate only. A Qualified Person has not done sufficient work to classify the Poplar historical estimate as a current mineral resource or mineral reserve, and Vizsla Copper is not treating it as current. CuEq = Cu US$4.00/lb, Mo US$15.00/lb, Au US$1,800/oz, Ag US$20/oz.
² VCU News Release Jul 16, 2026. CuEq = Cu US$4.00/lb, Mo US$25.00/lb, Au US$2,500/oz and Ag US$25/oz and conceptual recoveries of Cu: 80%, Mo: 80%, Au: 70% and Ag: 65%.
CuEq is provided for illustrative purpose only to show the combined grades of Cu, Mo, Au and Ag relative to copper price net of conceptual metallurgical recoveries.

Thira, Camp Lake and Copper Pond targets define an >8 km priority corridor, ~10 km south of the Poplar Deposit

Coincident geophysical and geochemical anomalies indicate multiple prospective porphyry centres across the broader system

Phase 1 drilling totalled more than 11,200 m in 21 holes, with all holes at Thira intersecting porphyry-related Cu-Mo mineralization

Phase 2 drilling will test fault-offset extensions at Thira, higher-grade mineralization south of Camp Lake and eastern extensions at Copper Pond

Thira Anchors a Growing Copper-Molybdenum Porphyry System

Discovered by Vizsla Copper in 2025, the Thira target has emerged as a significant copper-molybdenum discovery within a broader target corridor. Ongoing drilling is defining mineralization across Thira and adjacent targets, adding a new dimension to an already established porphyry system.

Mineralization confirmed over at least 800m east-west, extending to ~500m depth and remaining open in multiple directions

Near-surface copper-molybdenum mineralization provides targets for further exploration and technical evaluation

Drilling continues to expand the system, with multiple long intercepts demonstrating strong continuity

Drilling completed since 2021, including drilling at the Thira Discovery, has not been incorporated into the Poplar historical estimate

Source of compiled Vizsla Copper drill data: VCU News Release Jul 16, 2026.

*CuEq = Cu US$4.00/lb, Mo US$25.00/lb, Au US$2,500/oz and Ag US$25/oz and conceptual recoveries of Cu: 80%, Mo: 80%, Au: 70% and Ag: 65%. CuEq is provided for illustrative purpose only to show the combined grades of Cu, Mo, Au and Ag relative to copper price net of conceptual metallurgical recoveries.

Large, Shallow Porphyry System Remains Open

All drill holes at the Thira Discovery intersected zones of near-surface porphyry-related copper-molybdenum mineralization and together define a footprint of ~ 800 m x 900 m.

Source: VCU News Release Jul 16, 2026. *CuEq = Cu US$4.00/lb, Mo US$25.00/lb, Au US$2,500/oz and Ag US$25/oz and conceptual recoveries of Cu: 80%, Mo: 80%, Au: 70% and Ag: 65%. CuEq is provided for illustrative purpose only to show the combined grades of Cu, Mo, Au and Ag relative to copper price net of conceptual metallurgical recoveries.

Corporate Presentation

Explore the Poplar Project - a district-scale copper-molybdenum porphyry system in central British Columbia, anchored by an established mineral estimate and the emerging Thira discovery.

Photo Gallery

Qualified Person

The Company’s disclosure of technical or scientific information on this page has been reviewed and approved by Christopher Leslie, Ph.D., P.Geo., Technical Advisor for Vizsla Copper. Dr. Leslie is a Qualified Person as defined under the terms of National Instrument 43-101.

DISCLAIMERS

Historical technical information on this page, including historical exploration results, historical drilling and the Poplar historical estimate, has not been independently verified by Vizsla Copper except as expressly stated. Vizsla Copper considers this information relevant for geological context and exploration targeting purposes, but readers should not place undue reliance on historical information. A Qualified Person has not done sufficient work to classify the Poplar historical estimate as current mineral resources or mineral reserves, and Vizsla Copper is not treating the historical estimate as current mineral resources or mineral reserves.

View Sources

Poplar Project – Peer Sources

  • Berg Project — Surge Copper Corp., Mineral Reserve & Resource Estimate, effective June 12, 2026. surgecopper.com – Berg Project
  • Huckleberry Mine — Imperial Metals Corporation, Reserves & Resources; Huckleberry historical NI 43-101 reserve/resource figures. imperialmetals.com – Reserves & Resources
  • Equity Silver Mine — BC MINFILE database, Government of British Columbia, MINFILE No. 093L 001; historical production/resource information. apps.nrs.gov.bc.ca – Equity Silver record

Latest Poplar Project News

July 16, 2026

Vizsla Copper Drills 304.8 Meters of 0.48% CuEq at the Thira Discovery, Central British Columbia

May 19, 2026

Vizsla Copper Commences Drilling at the Woodjam Project and Provides Update on Drilling at the Poplar Project

April 6, 2026

Vizsla Copper Drills 435 Meters Of 0.49% CuEq At The Thira Discovery; Expands Footprint Of Copper-Molybdenum Mineralization 200 Meters To The North

Explore Vizsla Copper

Palmer VMS Project

Explore Vizsla Copper’s flagship project in Southeast Alaska

Team

Meet the leadership driving Vizsla Copper’s next phase of growth

Investors

Access the latest presentation, news, and investor materials

COPPERVIEW PROJECT

Notes on Mineral Resource Estimate

Please advise on Copperview Disclaimers. Or we can remove the link to this content.

WOODJAM PROJECT

Notes on Woodjam Historical Estimates

The Woodjam estimates are historical estimates within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The historical estimates are not being treated by Vizsla Copper as current mineral resources or mineral reserves. A Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

The historical estimates relate to the Southeast, Deerhorn and Takom deposits and were prepared for Gold Fields Horsefly Exploration Corp. and Consolidated Woodjam Copper Corp. with an effective date of May 15, 2013.

The Southeast historical estimate was disclosed in the technical report titled NI 43-101 Technical Report for 2012 Activities on the Woodjam South Property, Cariboo Mining Division, British Columbia, prepared by Ross Sherlock, Ph.D., P.Geo., Gold Fields Canada Exploration BV, and Alex Trueman, P.Geo., MAusIMM CP(Geo), Gold Fields Exploration, Inc., with an effective date of May 15, 2013. The Southeast historical estimate was completed by Alex Trueman, P.Geo., MAusIMM CP(Geo), Chief Resource Geologist, Gold Fields Exploration Inc.

The Deerhorn and Takom historical estimates were disclosed in the technical report titled NI 43-101 Technical Report for 2012 Activities on the Woodjam North Property, Cariboo Mining Division, British Columbia, prepared by Ross Sherlock, Ph.D., P.Geo., Gold Fields Canada Exploration BV, Jacqueline Blackwell, Ph.D., P.Geo., Gold Fields Canada Exploration BV, and Twila Skinner, P.Geo., Gold Fields Canada Exploration BV, with an effective date of May 15, 2013. The Deerhorn and Takom historical estimates were completed by Brian Wolfe, MAIG, Principal Resource Geologist, Gold Fields Australasia Pty. Ltd.

The Southeast and Deerhorn historical estimates were prepared using localized multivariate uniform conditioning, and the Takom historical estimate was prepared using ordinary kriging. Each historical estimate used a cut-off grade of US$8.60/t. The NSR calculation used metal price assumptions of US$1,650/oz Au and US$3.90/lb Cu and recovery assumptions of 69% Au and 85% Cu. The historical estimates were reported within modelled open pit shells based on price assumptions of US$1,650/oz Au and US$3.90/lb Cu.

Vizsla Copper considers the historical estimates relevant because they provide information regarding mineralization identified at the Woodjam Project and assist in guiding exploration planning. Vizsla Copper considers the historical estimates reliable for these limited purposes because they were prepared by qualified professionals using drilling and sampling information collected using modern methods available at the time. However, Vizsla Copper has not independently verified the historical estimates and readers should not rely on them as current mineral resources or mineral reserves.

Additional work required to verify or upgrade the historical estimates as current mineral resources may include, as applicable, data compilation, confirmation drilling, resampling, data verification, verification of historical drill hole locations and survey data, review and validation of historical QA/QC data, density verification, updated geological modelling, a site visit by a Qualified Person and preparation of a current mineral resource estimate and technical report in accordance with NI 43-101.

A Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves, and Vizsla Copper is not treating the historical estimates as current mineral resources or mineral reserves. There can be no assurance that the historical estimates, in whole or in part, will ever be verified as current mineral resources or converted into mineral reserves.

POPLAR PROJECT

Notes on Poplar Historical Estimate

The Poplar estimate is a historical estimate within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The historical estimate is based on the technical report titled Technical Report 2021 Update on the Poplar Deposit, Omineca Mining Division, British Columbia, prepared for Universal Copper Ltd. by James Ashton, P.E., SME-RM and Warren Robb, P.Geo., with a report date of September 2, 2021 and filed under Universal Copper Ltd.’s profile on SEDAR on September 8, 2021.

The historical estimate was reported at a 0.20% Cu cut-off within a modelled mineralized solid. The historical estimate comprises 152.3 million tonnes grading 0.32% Cu, 0.009% Mo, 0.09 g/t Au and 2.58 g/t Ag in the indicated category, and 139.3 million tonnes grading 0.29% Cu, 0.005% Mo, 0.07 g/t Au and 4.95 g/t Ag in the inferred category.

The historical estimate was prepared using a three-dimensional solid to constrain the interpolation of mineralization, using a 0.1% Cu grade limit as a guide. Large internal waste zones and certain post-mineral dykes were modelled. A total of 133 drill holes totaling 38,854 metres within the modelled area were used in the estimate. Copper, molybdenum, gold and silver assays within the mineralized solid were capped at 1.8% Cu, 0.16% Mo, 0.80 g/t Au and 70 g/t Ag, respectively. Five-metre composites were calculated and used for variography. Blocks were 5 m x 5 m x 10 m and were estimated for Cu, Mo, Au and Ag by ordinary kriging. Classification as indicated or inferred was based on each block’s proximity to data and grade continuity within the mineralized solid.

Vizsla Copper considers the historical estimate to be relevant because it provides information regarding the scale and grade of mineralization identified at the Poplar Project and assists in guiding future exploration and evaluation work. Vizsla Copper considers the historical estimate to be reliable for these limited purposes because it was prepared by qualified professionals using drilling, sampling and geological information available at the time and estimation methods considered reasonable when the estimate was prepared. However, Vizsla Copper has not independently verified the historical estimate and it should not be relied upon as a current mineral resource or mineral reserve.

The historical estimate used the categories “indicated” and “inferred”. These categories appear to be generally consistent with the corresponding mineral resource categories under NI 43-101 and the CIM Definition Standards; however, Vizsla Copper has not completed the work required to verify the historical estimate as a current mineral resource.

Additional work required to verify or upgrade the historical estimate as a current mineral resource may include, as applicable, confirmation drilling, verification of historical drill hole locations and survey data, validation of the drill hole database, review and validation of historical QA/QC data, density verification, metallurgical test work, updated geological modelling, application of current CIM Definition Standards and preparation of a current mineral resource estimate and technical report in accordance with NI 43-101.

A Qualified Person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves, and Vizsla Copper is not treating the historical estimate as current mineral resources or mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

PALMER PROJECT

Notes on Mineral Resource Estimate

(1) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The deposits have been classified as Indicated and Inferred based on confidence in the geological model, drill spacing. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The quantity and grade of reported Inferred Resources are uncertain in nature and there has not been sufficient work to define these Inferred Mineral Resources as Indicated or Measured Resources. There is no certainty that any part of a Mineral Resource will ever be converted into reserves.

(2) Mineral resources are reported using an assumed NSR which includes prices, recoveries and payabilities cut-off grade based on metal price assumptions*, variable metallurgical recovery assumptions**, mining costs, processing costs, general and administrative (G&A) costs and variable NSR factors. Mining (US$41.3), processing (US$23.92) and G&A costs (US$11.77) and Sustaining Capital (US$15.92) totaling US$92.9/t for Underground Mining.

(*) Metal price assumptions considered for the calculation of Metal Equivalent grades are: Gold (US$/oz 2,100.00), Silver (US$/oz 28.0), Copper (US$/lb 4.50), Lead (US$/lb 0.95) and Zinc (US$/lb 1.50)

(**) Cut-off grade calculations assume variable metallurgical recoveries as a function of grade and relative metal distribution. Average metallurgical recoveries are: SW/RW Zones: Gold (76.1%), Silver (90.2%), Copper (90.3%), Lead (82.9%) and Zinc (89.2%), AG Zone: Gold (66.0%), Silver (91.0%), Copper (54.8%), Lead (83.4%) and Zinc (94.8%) .

(3) NSR Calculations for SW/RW Domains: NSR= $77.25 x %Cu + $20.32 x %Zn + $9.64 x %Pb + $0.64 x g/t Ag + $43.07 x g/t Au

(4) NSR Calculation for AG Domain: NSR=$49.04 x %Cu + $22.25 x %Zn + $10.14 x %Pb + $0.70 x g/t Ag + $37.77 x g/t Au

(5) The resources are considered to have potential for extraction using underground methodology and constrained by mineable shapes. Resources are presented undiluted and in situ and are considered to have reasonable prospects for economic extraction.

(6) Barite as reported is shown for economic potential but has not been used in the NSR value at this stage.

(7) ZnEq defined by equation SW & RW = NSR value per block / $20.32; AG = NSR value per block / $22.25 (Note Barite has been excluded from the ZnEq and NSR calculations)

(8) CuEq defined by equation SW & RW = NSR value per block / $77.25; AG = NSR value per block / $49.04 (Note Barite has been excluded from the CuEq and NSR calculations)

(9) Mineral Resources are based on validated data, which have been subjected to QA/QC analysis, using capped, composited samples at 2m. Estimation has been completed using a combination of Ordinary Kriging and Inverse Distance estimation methodologies and classified based on confidence in the underlying data and drill spacing. Mineral resource tonnages have been rounded to reflect the precision of the estimate.

(10) The mineral resources were estimated by Benjamin Parsons, BSc , MSc Geology, MAusIMM (CP) #222568 of SRK, a Qualified Person.