TSXV: VCU

OTCQB: VCUFF

Home

3

Projects

Alaska, U.S. Projects

Palmer VMS Project

Alaska, USA

Delta Project

Alaska, U.S.

Helm Bay Project

Alaska, U.S.

British Columbia, Canada Projects

Poplar Porphyry Project

BC, Canada

Woodjam Project

BC, Canada

Miller Project

BC, Canada

Copperview Project

BC, Canada

Redgold Project

BC, Canada

News

Media

Contact

Media Coverage

In the News

Explore recent interviews, features and media coverage highlighting Vizsla Copper’s projects, market positioning, and growth strategy

Interviews and Podcasts

Vizsla Copper’s Alaska Pipeline Takes Shape After the Agnico Deal

November 5, 2026

Vizsla Copper’s Alaska Pipeline Takes Shape After the Agnico Deal

Audio
Vizsla Copper’s Agnico Eagle Deal & Palmer Drill Results | Cosa Resources | Keith Bodnachuk

October 9, 2026

Vizsla Copper’s Agnico Eagle Deal & Palmer Drill Results | Cosa Resources | Keith Bodnachuk

Video
Vizsla Copper: High-Grade Drilling Expands the Palmer Story

September 30, 2026

Vizsla Copper: High-Grade Drilling Expands the Palmer Story

Audio
Vizsla Copper Corp. (OTCQB: VCUFF | TSXV: VCU): Virtual Investor Conferences

August 27, 2026

Vizsla Copper Corp. (OTCQB: VCUFF | TSXV: VCU): Virtual Investor Conferences

Video
Vizsla Copper CEO discusses Palmer, Thira discovery and copper outlook

August 25, 2026

Vizsla Copper CEO discusses Palmer, Thira discovery and copper outlook

Video
Vizsla Copper: Rigs Turning, Assays Incoming and Copper Is Popping

August 12, 2026

Vizsla Copper: Rigs Turning, Assays Incoming and Copper Is Popping

Audio
OTCQB Podcast with Vizsla Copper Corp.

August 12, 2026

OTCQB Podcast with Vizsla Copper Corp.

Audio
Vizsla targets Palmer production within five years

July 27, 2026

Vizsla targets Palmer production within five years

Video
Beaver Creek: Vizsla Copper SVP Exploration, Alaska Peter Mercer

July 21, 2026

Beaver Creek: Vizsla Copper SVP Exploration, Alaska Peter Mercer

Video
Vizsla Copper: High-Grade Copper Growth in Alaska & British Columbia

July 20, 2026

Vizsla Copper: High-Grade Copper Growth in Alaska & British Columbia

Video
Craig Parry: The World Needs More Copper, but New Mines Aren’t Coming Fast Enough

July 15, 2026

Craig Parry: The World Needs More Copper, but New Mines Aren’t Coming Fast Enough

Audio
Craig Parry: Updates on Vizsla Silver, Copper and Royalty

July 11, 2026

Craig Parry: Updates on Vizsla Silver, Copper and Royalty

Video

May 20, 2026

Yahoo Finance – New episode: Copper-Gold Mining – the Strategic Convergence of Two Sectors

Audio
Why Copper Could Be Heading to a Price No One Is Ready For | Craig Parry – Vizla

May 15, 2026

Why Copper Could Be Heading to a Price No One Is Ready For | Craig Parry – Vizla

Video
Corporate Update With Vizsla Copper

May 3, 2026

Corporate Update With Vizsla Copper

Video
Kens 5 – With Gold and Silver Hovering Near Record Highs, Should you Sell it?

March 12, 2026

Kens 5 – With Gold and Silver Hovering Near Record Highs, Should you Sell it?

Video
Why Acquiring Copper in the U.S. Just Became Critical

December 21, 2025

Why Acquiring Copper in the U.S. Just Became Critical

Video
CEO Clips Vizsla Copper: Positioned to Fuel the Coming Copper Supercycle

November 9, 2025

CEO Clips Vizsla Copper: Positioned to Fuel the Coming Copper Supercycle

Video
A New Copper Porphyry Discovery in BC | Vizsla Copper CEO Interview

August 11, 2025

A New Copper Porphyry Discovery in BC | Vizsla Copper CEO Interview

Video
Advancing Copper-Gold Exploration in British Columbia | Vizsla Copper

October 9, 2024

Advancing Copper-Gold Exploration in British Columbia | Vizsla Copper

Video

In the Press

November 4, 2026

Vizsla Copper completes 2026 field season in Alaska

October 22, 2026

Vizsla Copper begins inaugural drilling at Copperview

October 20, 2026

Vizsla Copper commences inaugural drill programme at The Copperview Copper Project

October 19, 2026

Vizsla Copper launches 2,000-metre Copperview drill program, wraps Poplar phase-2

October 15, 2026

TNM Drill Down: Pecoy leads recent copper assays

October 7, 2026

Vizsla Copper logs high-grade silver at Alaska project

October 7, 2026

Vizsla Copper logs high-grade silver at Alaska project

October 7, 2026

Vizsla Copper logs high-grade silver in Alaska

October 6, 2026

Agnico Eagle sells Delta, Helm Bay projects to Vizsla Copper

October 1, 2026

The projects behind Alaska’s copper paradox

October 1, 2026

Vizsla drills ‘exceptional’ silver-rich interval at Palmer

September 25, 2026

Vizsla Copper Corp. Announces Staking of The Miller Copper-Gold Project, Central British Columbia

September 25, 2026

The CIM Magazine Weekly Mining News Recap for September 25

September 24, 2026

Vizsla Copper Corp. announces staking of the Miller copper-gold project, Central British Columbia

September 23, 2026

Vizsla buys property bordering Mt. Milligan mine

September 17, 2026

Vizsla Copper Acquires Precious Metal And Gold Projects From Agnico Eagle

September 16, 2026

Vizsla Copper acquires precious metal and gold projects from Agnico Eagle

September 10, 2026

Vizsla Copper to Acquire Two AEM Projects

September 9, 2026

Vizsla Copper agrees to acquire Alaska projects from Agnico-Eagle

September 9, 2026

Agnico takes 22% of Vizsla in $32M Alaska deal

September 9, 2026

Vizsla Copper to acquire Agnico Eagle’s Alaska projects

September 9, 2026

Vizsla to acquire Agnico’s Alaska projects

September 9, 2026

Vizsla Copper to acquire Delta Polymetallic VMS and Helm Bay Gold Projects in transaction with Agnico Eagle

September 9, 2026

Canada’s largest miner Agnico sells two Alaskan projects to Viszla Copper for 20% shareholding, royalties

September 9, 2026

Agnico takes 22% of Vizsla in $32M Alaska deal

August 26, 2026

Vizsla cuts 3.3% copper over 48 metres in BC

July 23, 2026

Vizsla Copper Corp. provides exploration update for 2026 diamond drill programme at the Palmer VMS Project In Alaska

July 22, 2026

No thinking. Finish the sentence… by Shae Russell

July 21, 2026

Vizsla Copper intersects 49m sulphides at Palmer

July 20, 2026

Vizsla Copper reports phase one drill results at Thira Discovery

July 20, 2026

Thira drill success bumps Vizsla Copper shares

June 24, 2026

Vizsla Copper Commences 10,000m Drilling at Alaska Palmer VMS Project, Targeting High-Grade Copper-Zinc Mineralization

June 22, 2026

Mining Technology – Vizsla Copper Begins 10,000m Drilling at Alaska Palmer VMS Project

June 21, 2026

Vizsla Copper begins Drilling at Palmer

June 19, 2026

Global Mining Review – Vizsla Copper Commences 2026 Drill Programme

June 18, 2026

Canadian Mining Journal – Drills Turning at Vizsla’s Palmer Project

May 29, 2026

Mining Weekly – Canadian Explorer Vizsla Copper turns Drill Focus to Woodjam, Palmer while it Awaits Poplar Results

May 20, 2026

Canadian Mining Journal – Vizsla Copper Commences Woodjam Drill Campaign, Wraps Poplar phase‑1

May 20, 2026

Mining Technology – Drilling Under way at Vizsla Copper’s Woodjam Project in BC

May 20, 2026

Mining Technology – Copper-Gold Mining – the Strategic Convergence of Two Sectors

April 17, 2026

Global Mining Review – Vizsla Copper Receives Drilling Permit for the Copperview Project

April 16, 2026

Canadian Mining Journal – Vizsla Secures Five-Year Exploration Permit for Copperview

April 9, 2026

Mining.com.au – Vizsla Copper looks into Becoming North American Producer

April 8, 2026

Kitco – Copper will Outperform Gold and Silver, Could Hit $30 in the New Commodity Cycle

April 6, 2026

Northern Miner – Vizsla Drilling Extends Poplar Copper System in B.C.

April 2, 2026

Global Mining Report – Vizsla Copper Announces Board Approval of 2026 Budget and Exploration Programme for the Palmer Project

April 1, 2026

Mining News – Vizsla budgets $13.7M for Palmer program

February 27, 2026

Global Mining Review – Vizsla Copper Secures Extension of Trust Land Lease at the Palmer Project

February 3, 2026

Global Mining Report – Vizsla Copper Receives Letter of Support from Alaska Governor and Outlines 2026 Exploration Plans at the Palmer Project

January 20, 2026

Yahoo Finance – Gold, Silver Surge Amid Trump Greenland Crisis: ‘The Debasement Trade is on Fire’

Third-party media content is provided for convenience only. The Company did not prepare and does not endorse all statements contained in third-party content. Investors should rely on the Company’s news releases, technical reports and continuous disclosure filings.

Explore Vizsla Copper

Palmer VMS Project

Explore Vizsla Copper’s flagship project in Southeast Alaska

Team

Meet the leadership driving Vizsla Copper’s next phase of growth

Investors

Access the latest presentation, news, and investor materials

COPPERVIEW PROJECT

Notes on Mineral Resource Estimate

Please advise on Copperview Disclaimers. Or we can remove the link to this content.

WOODJAM PROJECT

Notes on Woodjam Historical Estimates

The Woodjam estimates are historical estimates within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The historical estimates are not being treated by Vizsla Copper as current mineral resources or mineral reserves. A Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

The historical estimates relate to the Southeast, Deerhorn and Takom deposits and were prepared for Gold Fields Horsefly Exploration Corp. and Consolidated Woodjam Copper Corp. with an effective date of May 15, 2013.

The Southeast historical estimate was disclosed in the technical report titled NI 43-101 Technical Report for 2012 Activities on the Woodjam South Property, Cariboo Mining Division, British Columbia, prepared by Ross Sherlock, Ph.D., P.Geo., Gold Fields Canada Exploration BV, and Alex Trueman, P.Geo., MAusIMM CP(Geo), Gold Fields Exploration, Inc., with an effective date of May 15, 2013. The Southeast historical estimate was completed by Alex Trueman, P.Geo., MAusIMM CP(Geo), Chief Resource Geologist, Gold Fields Exploration Inc.

The Deerhorn and Takom historical estimates were disclosed in the technical report titled NI 43-101 Technical Report for 2012 Activities on the Woodjam North Property, Cariboo Mining Division, British Columbia, prepared by Ross Sherlock, Ph.D., P.Geo., Gold Fields Canada Exploration BV, Jacqueline Blackwell, Ph.D., P.Geo., Gold Fields Canada Exploration BV, and Twila Skinner, P.Geo., Gold Fields Canada Exploration BV, with an effective date of May 15, 2013. The Deerhorn and Takom historical estimates were completed by Brian Wolfe, MAIG, Principal Resource Geologist, Gold Fields Australasia Pty. Ltd.

The Southeast and Deerhorn historical estimates were prepared using localized multivariate uniform conditioning, and the Takom historical estimate was prepared using ordinary kriging. Each historical estimate used a cut-off grade of US$8.60/t. The NSR calculation used metal price assumptions of US$1,650/oz Au and US$3.90/lb Cu and recovery assumptions of 69% Au and 85% Cu. The historical estimates were reported within modelled open pit shells based on price assumptions of US$1,650/oz Au and US$3.90/lb Cu.

Vizsla Copper considers the historical estimates relevant because they provide information regarding mineralization identified at the Woodjam Project and assist in guiding exploration planning. Vizsla Copper considers the historical estimates reliable for these limited purposes because they were prepared by qualified professionals using drilling and sampling information collected using modern methods available at the time. However, Vizsla Copper has not independently verified the historical estimates and readers should not rely on them as current mineral resources or mineral reserves.

Additional work required to verify or upgrade the historical estimates as current mineral resources may include, as applicable, data compilation, confirmation drilling, resampling, data verification, verification of historical drill hole locations and survey data, review and validation of historical QA/QC data, density verification, updated geological modelling, a site visit by a Qualified Person and preparation of a current mineral resource estimate and technical report in accordance with NI 43-101.

A Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves, and Vizsla Copper is not treating the historical estimates as current mineral resources or mineral reserves. There can be no assurance that the historical estimates, in whole or in part, will ever be verified as current mineral resources or converted into mineral reserves.

POPLAR PROJECT

Notes on Poplar Historical Estimate

The Poplar estimate is a historical estimate within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The historical estimate is based on the technical report titled Technical Report 2021 Update on the Poplar Deposit, Omineca Mining Division, British Columbia, prepared for Universal Copper Ltd. by James Ashton, P.E., SME-RM and Warren Robb, P.Geo., with a report date of September 2, 2021 and filed under Universal Copper Ltd.’s profile on SEDAR on September 8, 2021.

The historical estimate was reported at a 0.20% Cu cut-off within a modelled mineralized solid. The historical estimate comprises 152.3 million tonnes grading 0.32% Cu, 0.009% Mo, 0.09 g/t Au and 2.58 g/t Ag in the indicated category, and 139.3 million tonnes grading 0.29% Cu, 0.005% Mo, 0.07 g/t Au and 4.95 g/t Ag in the inferred category.

The historical estimate was prepared using a three-dimensional solid to constrain the interpolation of mineralization, using a 0.1% Cu grade limit as a guide. Large internal waste zones and certain post-mineral dykes were modelled. A total of 133 drill holes totaling 38,854 metres within the modelled area were used in the estimate. Copper, molybdenum, gold and silver assays within the mineralized solid were capped at 1.8% Cu, 0.16% Mo, 0.80 g/t Au and 70 g/t Ag, respectively. Five-metre composites were calculated and used for variography. Blocks were 5 m x 5 m x 10 m and were estimated for Cu, Mo, Au and Ag by ordinary kriging. Classification as indicated or inferred was based on each block’s proximity to data and grade continuity within the mineralized solid.

Vizsla Copper considers the historical estimate to be relevant because it provides information regarding the scale and grade of mineralization identified at the Poplar Project and assists in guiding future exploration and evaluation work. Vizsla Copper considers the historical estimate to be reliable for these limited purposes because it was prepared by qualified professionals using drilling, sampling and geological information available at the time and estimation methods considered reasonable when the estimate was prepared. However, Vizsla Copper has not independently verified the historical estimate and it should not be relied upon as a current mineral resource or mineral reserve.

The historical estimate used the categories “indicated” and “inferred”. These categories appear to be generally consistent with the corresponding mineral resource categories under NI 43-101 and the CIM Definition Standards; however, Vizsla Copper has not completed the work required to verify the historical estimate as a current mineral resource.

Additional work required to verify or upgrade the historical estimate as a current mineral resource may include, as applicable, confirmation drilling, verification of historical drill hole locations and survey data, validation of the drill hole database, review and validation of historical QA/QC data, density verification, metallurgical test work, updated geological modelling, application of current CIM Definition Standards and preparation of a current mineral resource estimate and technical report in accordance with NI 43-101.

A Qualified Person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves, and Vizsla Copper is not treating the historical estimate as current mineral resources or mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

PALMER PROJECT

Notes on Mineral Resource Estimate

(1) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The deposits have been classified as Indicated and Inferred based on confidence in the geological model, drill spacing. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The quantity and grade of reported Inferred Resources are uncertain in nature and there has not been sufficient work to define these Inferred Mineral Resources as Indicated or Measured Resources. There is no certainty that any part of a Mineral Resource will ever be converted into reserves.

(2) Mineral resources are reported using an assumed NSR which includes prices, recoveries and payabilities cut-off grade based on metal price assumptions*, variable metallurgical recovery assumptions**, mining costs, processing costs, general and administrative (G&A) costs and variable NSR factors. Mining (US$41.3), processing (US$23.92) and G&A costs (US$11.77) and Sustaining Capital (US$15.92) totaling US$92.9/t for Underground Mining.

(*) Metal price assumptions considered for the calculation of Metal Equivalent grades are: Gold (US$/oz 2,100.00), Silver (US$/oz 28.0), Copper (US$/lb 4.50), Lead (US$/lb 0.95) and Zinc (US$/lb 1.50)

(**) Cut-off grade calculations assume variable metallurgical recoveries as a function of grade and relative metal distribution. Average metallurgical recoveries are: SW/RW Zones: Gold (76.1%), Silver (90.2%), Copper (90.3%), Lead (82.9%) and Zinc (89.2%), AG Zone: Gold (66.0%), Silver (91.0%), Copper (54.8%), Lead (83.4%) and Zinc (94.8%) .

(3) NSR Calculations for SW/RW Domains: NSR= $77.25 x %Cu + $20.32 x %Zn + $9.64 x %Pb + $0.64 x g/t Ag + $43.07 x g/t Au

(4) NSR Calculation for AG Domain: NSR=$49.04 x %Cu + $22.25 x %Zn + $10.14 x %Pb + $0.70 x g/t Ag + $37.77 x g/t Au

(5) The resources are considered to have potential for extraction using underground methodology and constrained by mineable shapes. Resources are presented undiluted and in situ and are considered to have reasonable prospects for economic extraction.

(6) Barite as reported is shown for economic potential but has not been used in the NSR value at this stage.

(7) ZnEq defined by equation SW & RW = NSR value per block / $20.32; AG = NSR value per block / $22.25 (Note Barite has been excluded from the ZnEq and NSR calculations)

(8) CuEq defined by equation SW & RW = NSR value per block / $77.25; AG = NSR value per block / $49.04 (Note Barite has been excluded from the CuEq and NSR calculations)

(9) Mineral Resources are based on validated data, which have been subjected to QA/QC analysis, using capped, composited samples at 2m. Estimation has been completed using a combination of Ordinary Kriging and Inverse Distance estimation methodologies and classified based on confidence in the underlying data and drill spacing. Mineral resource tonnages have been rounded to reflect the precision of the estimate.

(10) The mineral resources were estimated by Benjamin Parsons, BSc , MSc Geology, MAusIMM (CP) #222568 of SRK, a Qualified Person.