TSXV: VCU

OTCQB: VCUFF

Home

3

Projects

Alaska, U.S. Projects

Palmer VMS Project

Alaska, USA

Delta Project

Alaska, U.S.

Helm Bay Project

Alaska, U.S.

British Columbia, Canada Projects

Poplar Porphyry Project

BC, Canada

Woodjam Project

BC, Canada

Miller Project

BC, Canada

Copperview Project

BC, Canada

Redgold Project

BC, Canada

News

Media

Contact

April 1, 2026

Vizsla Copper Announces Board Approval of 2026 Budget and Exploration Program for the Palmer Project

Vancouver, British Columbia, April 1, 2026 – Vizsla Copper Corp. (TSXV: VCU, OTCQB: VCUFF, FRANKFURT: 97E0) (“Vizsla Copper” or the “Company”) is pleased to announce that its Board of Directors has approved the 2026 exploration and development budget for the Palmer VMS Project in Southeast Alaska.  

The approved 2026 program outlines a comprehensive exploration, technical, and project progression strategy designed to advance the Palmer Project toward economic evaluation while continuing to expand its critical minerals resource base.

2026 Program Highlights

  • Total approved budget: US$13.7 million (C$19.2 million)
  • Diamond drilling: ~10,000 meters (~32,800 feet) utilizing two drill rigs targeting areas for high grade expansion and high potential for a new discovery
  • Expanded technical studies: mineral resource refinement including integration of barite, critical trade-off studies, and advanced 3D geological modelling
  • Geophysics: compilation and reprocessing of historical datasets and new survey acquisition to refine exploration for new mineralization
  • Project development: continued environmental baseline collection, preparation of camp and support facilities for expanded drilling and assessment programs in 2027

 

Craig Parry, Executive Chairman and CEO, commented:

“The approval of the 2026 budget marks an important step forward in advancing the Palmer VMS Project. This program is designed to both grow the resource base and continue de-risking the project through a disciplined technical approach. With strong financial backing and a clear execution plan, we believe Palmer is well positioned to deliver meaningful results in 2026.”

 

Peter Mercer, Senior Vice President, Alaska, added:

“The 2026 program reflects a balanced approach between exploration, technical advancement, and development readiness. With drilling, geophysics, and engineering work progressing in parallel, we are building the dataset required to move Palmer toward economic evaluation while continuing to unlock the potential of this critical mineral project.”

The Palmer Project: Strategic Objectives for 2026

The Palmer Project is a high-grade, polymetallic volcanogenic massive sulphide (VMS) project located in Southeast Alaska. The project hosts an updated mineral resource estimate1 and numerous underexplored targets distributed along more than 15 kilometers of prospective stratigraphy, the project represents a district-scale opportunity with proven mineral endowment and significant potential for resource expansion and new discoveries.

The 2026 program is designed to execute on three integrated priorities - resource growth, discovery, and advancement toward development through a coordinated exploration and technical work program.

At the core of the program is a 10,000 meter (~32,800 feet) diamond drilling campaign utilizing two drill rigs from June to September 2026. Drilling will focus on expanding high-grade copper-zinc mineralization at the Palmer Deposit South Wall Zone, testing high-grade priority extensions, and advancing multiple high-potential regional targets.

A key focus of the 2026 program will be the continued delineation and expansion of Zone 1, where a high-grade copper-rich core was identified during the 2023 and 2024 drilling campaigns. Highlight intercepts include 23.9 meters grading 11.2% copper equivalent (28.0% zinc equivalent) in hole CMR23-171 and 43.8 meters grading 8.2% copper equivalent (20.6% zinc equivalent) in hole CMR23-1722, confirming the presence of a high-grade mineralized core. This year’s drilling program is designed to systematically step out along strike to expand this core, while refining the geological and structural model and controls on mineralization.

The 2026 drill program is supported by a significantly upgraded targeting framework developed through the integration of geological, geochemical, geophysical, and remote sensing datasets into a unified 3D model. Recent work has refined priority conductive corridors in several prospective target areas across the property, providing a strong pipeline of drill-ready opportunities and enhancing the probability of success across the district.

In parallel with drilling, the Company will advance a suite of technical programs aimed at strengthening the Palmer Project’s development pathway. This includes reprocessing and acquisition of geophysical data to further refine targets, continued geological modelling, and targeted surface exploration programs focused on ranking and advancing underexplored prospects. Work is currently underway to incorporate barite into future mineral resource estimates and to evaluate additional critical minerals across the system, supporting the Project’s positioning as a multi-commodity critical minerals asset.

The 2026 program also includes engineering and environmental baseline work to support future economic studies. Camp upgrades and operational improvements are being implemented to support current activities and position the project for larger future programs.

Figure 1: Target Areas for 2026 Diamond Drilling and Exploration Program

 

Aligned with U.S. Critical Minerals Strategy

The Palmer Project hosts copper, zinc, gold, silver, and barite mineralization, all recognized as strategic and critical to U.S. domestic supply chains, including energy transition technologies, infrastructure, and defense applications.

Located in Southeast Alaska, Palmer benefits from a stable regulatory environment, existing infrastructure access, and proximity to tidewater, positioning the project as a potential contributor to secure, domestic sources of critical minerals.

The 2026 program is designed to advance both the scale and confidence of the resource while progressing the technical work required to support future development decisions. This approach aligns with broader U.S. policy objectives focused on strengthening domestic mineral supply chains and reducing reliance on foreign sources of critical materials.

 

 

Commitment to Responsible Development

Vizsla Copper recognizes that the Palmer Project is located within a region of significant ecological, cultural, and community importance. Vizsla’s approach to project development will be guided by a commitment to listen, learn, and understand all community perspectives while operating within all State and Federal regulatory framework. Our approach is guided by the same Alaskan solution that shaped the original Chilkat Valley consensus: collaboration, transparency, and respect for multiple land uses.

 

About Vizsla Copper

Vizsla Copper is a critical-minerals focused exploration and development company headquartered in Vancouver, Canada. The Company is primarily focused on its Palmer VMS project in Southeast Alaska, and its Poplar and Woodjam porphyry-related projects in British Columbia.

All of the Company’s projects are well situated amongst significant infrastructure. The Company’s growth strategy is focused on the exploration and development of the properties within its portfolio in addition to value-accretive acquisitions. Vizsla Copper’s vision is to be a responsible copper explorer and developer in stable mining jurisdictions, and it is committed to socially responsible exploration and development, working safely, ethically, and with integrity.

Vizsla Copper is backed by Inventa Capital Corp., a premier investment group founded in 2017 with the goal of discovering and funding opportunities in the resource sector.

Additional information about the Company is available on SEDAR+ (www.sedarplus.ca) and the Company’s website (www.vizslacopper.com).

 

Qualified Person and National Instrument 43-101 Disclosure

The Company’s disclosure of technical or scientific information in this press release has been reviewed and approved by Peter Mercer, P.Geo., Senior Vice President for Vizsla Copper. Mr. Mercer is a Qualified Person as defined under the terms of National Instrument 43-101.

References

  1. SRK - Parsons, B. and Kelloff, K. (2025). NI 43-101 Technical Report, Mineral Resource Estimate, Palmer Project, Alaska, USA. Report prepared for Constantine Metal Resources Ltd. by SRK Consulting (U.S.), Inc. Effective Date: January 13, 2025
  2. American Pacific Mining Corp. press release dated January 10, 2024.

 

Contact Information: For more information and to sign-up to the mailing list, please contact:

Craig Parry, Executive Chairman, Chief Executive Officer

Tel: (604) 364-2215 | Email: info@vizslacopper.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

 

 

FORWARD LOOKING STATEMENTS

The information contained herein contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to the Company’s exploration plans.

Such forward-looking information and statements are based on numerous assumptions, including among others, that the results of planned exploration activities are as anticipated, the anticipated cost of planned exploration activities, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms, that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company’s planned exploration activities will be available on reasonable terms and in a timely manner. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.

Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual events or results in future periods to differ materially from any projections of future events or results expressed or implied by such forward-looking information or statements, including, among others: negative operating cash flow and dependence on third party financing, uncertainty of additional financing, no known mineral reserves or resources, the limited operating history of the Company, the influence of a large shareholder, aboriginal title and consultation issues, reliance on key management and other personnel, actual results of exploration activities being different than anticipated, changes in exploration programs based upon results, availability of third party contractors, availability of equipment and supplies, failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated with the mineral exploration industry, environmental risks, changes in laws and regulations, community relations and delays in obtaining governmental or other approvals.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.  The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

Explore Vizsla Copper

Palmer VMS Project

Explore Vizsla Copper’s flagship project in Southeast Alaska

Poplar Project

Explore Vizsla Copper’s copper-gold porphyry project in British Columbia

Investors

Access the latest presentation, news, and investor materials

COPPERVIEW PROJECT

Notes on Mineral Resource Estimate

Please advise on Copperview Disclaimers. Or we can remove the link to this content.

WOODJAM PROJECT

Notes on Woodjam Historical Estimates

The Woodjam estimates are historical estimates within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The historical estimates are not being treated by Vizsla Copper as current mineral resources or mineral reserves. A Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

The historical estimates relate to the Southeast, Deerhorn and Takom deposits and were prepared for Gold Fields Horsefly Exploration Corp. and Consolidated Woodjam Copper Corp. with an effective date of May 15, 2013.

The Southeast historical estimate was disclosed in the technical report titled NI 43-101 Technical Report for 2012 Activities on the Woodjam South Property, Cariboo Mining Division, British Columbia, prepared by Ross Sherlock, Ph.D., P.Geo., Gold Fields Canada Exploration BV, and Alex Trueman, P.Geo., MAusIMM CP(Geo), Gold Fields Exploration, Inc., with an effective date of May 15, 2013. The Southeast historical estimate was completed by Alex Trueman, P.Geo., MAusIMM CP(Geo), Chief Resource Geologist, Gold Fields Exploration Inc.

The Deerhorn and Takom historical estimates were disclosed in the technical report titled NI 43-101 Technical Report for 2012 Activities on the Woodjam North Property, Cariboo Mining Division, British Columbia, prepared by Ross Sherlock, Ph.D., P.Geo., Gold Fields Canada Exploration BV, Jacqueline Blackwell, Ph.D., P.Geo., Gold Fields Canada Exploration BV, and Twila Skinner, P.Geo., Gold Fields Canada Exploration BV, with an effective date of May 15, 2013. The Deerhorn and Takom historical estimates were completed by Brian Wolfe, MAIG, Principal Resource Geologist, Gold Fields Australasia Pty. Ltd.

The Southeast and Deerhorn historical estimates were prepared using localized multivariate uniform conditioning, and the Takom historical estimate was prepared using ordinary kriging. Each historical estimate used a cut-off grade of US$8.60/t. The NSR calculation used metal price assumptions of US$1,650/oz Au and US$3.90/lb Cu and recovery assumptions of 69% Au and 85% Cu. The historical estimates were reported within modelled open pit shells based on price assumptions of US$1,650/oz Au and US$3.90/lb Cu.

Vizsla Copper considers the historical estimates relevant because they provide information regarding mineralization identified at the Woodjam Project and assist in guiding exploration planning. Vizsla Copper considers the historical estimates reliable for these limited purposes because they were prepared by qualified professionals using drilling and sampling information collected using modern methods available at the time. However, Vizsla Copper has not independently verified the historical estimates and readers should not rely on them as current mineral resources or mineral reserves.

Additional work required to verify or upgrade the historical estimates as current mineral resources may include, as applicable, data compilation, confirmation drilling, resampling, data verification, verification of historical drill hole locations and survey data, review and validation of historical QA/QC data, density verification, updated geological modelling, a site visit by a Qualified Person and preparation of a current mineral resource estimate and technical report in accordance with NI 43-101.

A Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves, and Vizsla Copper is not treating the historical estimates as current mineral resources or mineral reserves. There can be no assurance that the historical estimates, in whole or in part, will ever be verified as current mineral resources or converted into mineral reserves.

POPLAR PROJECT

Notes on Poplar Historical Estimate

The Poplar estimate is a historical estimate within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The historical estimate is based on the technical report titled Technical Report 2021 Update on the Poplar Deposit, Omineca Mining Division, British Columbia, prepared for Universal Copper Ltd. by James Ashton, P.E., SME-RM and Warren Robb, P.Geo., with a report date of September 2, 2021 and filed under Universal Copper Ltd.’s profile on SEDAR on September 8, 2021.

The historical estimate was reported at a 0.20% Cu cut-off within a modelled mineralized solid. The historical estimate comprises 152.3 million tonnes grading 0.32% Cu, 0.009% Mo, 0.09 g/t Au and 2.58 g/t Ag in the indicated category, and 139.3 million tonnes grading 0.29% Cu, 0.005% Mo, 0.07 g/t Au and 4.95 g/t Ag in the inferred category.

The historical estimate was prepared using a three-dimensional solid to constrain the interpolation of mineralization, using a 0.1% Cu grade limit as a guide. Large internal waste zones and certain post-mineral dykes were modelled. A total of 133 drill holes totaling 38,854 metres within the modelled area were used in the estimate. Copper, molybdenum, gold and silver assays within the mineralized solid were capped at 1.8% Cu, 0.16% Mo, 0.80 g/t Au and 70 g/t Ag, respectively. Five-metre composites were calculated and used for variography. Blocks were 5 m x 5 m x 10 m and were estimated for Cu, Mo, Au and Ag by ordinary kriging. Classification as indicated or inferred was based on each block’s proximity to data and grade continuity within the mineralized solid.

Vizsla Copper considers the historical estimate to be relevant because it provides information regarding the scale and grade of mineralization identified at the Poplar Project and assists in guiding future exploration and evaluation work. Vizsla Copper considers the historical estimate to be reliable for these limited purposes because it was prepared by qualified professionals using drilling, sampling and geological information available at the time and estimation methods considered reasonable when the estimate was prepared. However, Vizsla Copper has not independently verified the historical estimate and it should not be relied upon as a current mineral resource or mineral reserve.

The historical estimate used the categories “indicated” and “inferred”. These categories appear to be generally consistent with the corresponding mineral resource categories under NI 43-101 and the CIM Definition Standards; however, Vizsla Copper has not completed the work required to verify the historical estimate as a current mineral resource.

Additional work required to verify or upgrade the historical estimate as a current mineral resource may include, as applicable, confirmation drilling, verification of historical drill hole locations and survey data, validation of the drill hole database, review and validation of historical QA/QC data, density verification, metallurgical test work, updated geological modelling, application of current CIM Definition Standards and preparation of a current mineral resource estimate and technical report in accordance with NI 43-101.

A Qualified Person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves, and Vizsla Copper is not treating the historical estimate as current mineral resources or mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

PALMER PROJECT

Notes on Mineral Resource Estimate

(1) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The deposits have been classified as Indicated and Inferred based on confidence in the geological model, drill spacing. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The quantity and grade of reported Inferred Resources are uncertain in nature and there has not been sufficient work to define these Inferred Mineral Resources as Indicated or Measured Resources. There is no certainty that any part of a Mineral Resource will ever be converted into reserves.

(2) Mineral resources are reported using an assumed NSR which includes prices, recoveries and payabilities cut-off grade based on metal price assumptions*, variable metallurgical recovery assumptions**, mining costs, processing costs, general and administrative (G&A) costs and variable NSR factors. Mining (US$41.3), processing (US$23.92) and G&A costs (US$11.77) and Sustaining Capital (US$15.92) totaling US$92.9/t for Underground Mining.

(*) Metal price assumptions considered for the calculation of Metal Equivalent grades are: Gold (US$/oz 2,100.00), Silver (US$/oz 28.0), Copper (US$/lb 4.50), Lead (US$/lb 0.95) and Zinc (US$/lb 1.50)

(**) Cut-off grade calculations assume variable metallurgical recoveries as a function of grade and relative metal distribution. Average metallurgical recoveries are: SW/RW Zones: Gold (76.1%), Silver (90.2%), Copper (90.3%), Lead (82.9%) and Zinc (89.2%), AG Zone: Gold (66.0%), Silver (91.0%), Copper (54.8%), Lead (83.4%) and Zinc (94.8%) .

(3) NSR Calculations for SW/RW Domains: NSR= $77.25 x %Cu + $20.32 x %Zn + $9.64 x %Pb + $0.64 x g/t Ag + $43.07 x g/t Au

(4) NSR Calculation for AG Domain: NSR=$49.04 x %Cu + $22.25 x %Zn + $10.14 x %Pb + $0.70 x g/t Ag + $37.77 x g/t Au

(5) The resources are considered to have potential for extraction using underground methodology and constrained by mineable shapes. Resources are presented undiluted and in situ and are considered to have reasonable prospects for economic extraction.

(6) Barite as reported is shown for economic potential but has not been used in the NSR value at this stage.

(7) ZnEq defined by equation SW & RW = NSR value per block / $20.32; AG = NSR value per block / $22.25 (Note Barite has been excluded from the ZnEq and NSR calculations)

(8) CuEq defined by equation SW & RW = NSR value per block / $77.25; AG = NSR value per block / $49.04 (Note Barite has been excluded from the CuEq and NSR calculations)

(9) Mineral Resources are based on validated data, which have been subjected to QA/QC analysis, using capped, composited samples at 2m. Estimation has been completed using a combination of Ordinary Kriging and Inverse Distance estimation methodologies and classified based on confidence in the underlying data and drill spacing. Mineral resource tonnages have been rounded to reflect the precision of the estimate.

(10) The mineral resources were estimated by Benjamin Parsons, BSc , MSc Geology, MAusIMM (CP) #222568 of SRK, a Qualified Person.