TSXV: VCU

OTCQB: VCUFF

Home

3

Projects

Alaska, U.S. Projects

Palmer VMS Project

Alaska, USA

Delta Project

Alaska, U.S.

Helm Bay Project

Alaska, U.S.

British Columbia, Canada Projects

Poplar Porphyry Project

BC, Canada

Woodjam Project

BC, Canada

Miller Project

BC, Canada

Copperview Project

BC, Canada

Redgold Project

BC, Canada

News

Media

Contact

October 8, 2024

Vizsla Copper Identifies Strong Copper-In-Soil Anomaly at Poplar South

Vancouver, British Columbia, October 8, 2024 – Vizsla Copper Corp. (TSXV: VCU, OTCQB: VCUFF, FRANKFURT: 97E0) (“Vizsla Copper” or the “Company”) is pleased to report results from a soil geochemical survey at its Poplar South target area on the Poplar project (the “Poplar Project” or “Poplar”) in central BC (Figure 1).  The Poplar project is also home to the porphyry-related Poplar copper and gold deposit.

HIGHLIGHTS

  • Broad multi-element soil geochemical anomaly identified at Poplar South
  • Copper, molybdenum and silver soil geochemical anomalies are coincident with geological and airborne geophysical targets
  • Induced Polarization (IP) ground geophysical surveying is currently underway

 

“The Poplar South target area is one of the most compelling copper exploration targets I’ve ever come across,” commented Craig Parry, Executive Chairman.  “With the current high (and rising) copper prices, this is the right time to be adding Poplar South to our portfolio of highly prospective drill-ready targets.”

“At Poplar South we’re seeing anomalies from many datasets overlapping in one place,” commented Steve Blower, Vice President of Exploration.  “Alteration mapping, airborne geophysical surveys, historical drilling results plus the new soil geochemistry results all point to one large, discrete target area at Poplar South.  An IP geophysical survey is underway and represents the final piece of the puzzle to refine the drilling plan.” 

The Soil Survey

The Poplar South target area is characterized by a broad, approximately 8 by 2 kilometer zone of quartz, sericite and pyrite (phyllic) alteration observed along local road-cuts and sparse outcrop at higher elevations on ridge tops (Figure 2, see News Release dated August 12, 2024). Zones of strong epidote-chlorite-magnetite alteration locally crop out near the valley bottom, proximal to the strongest geochemical and geophysical anomalies. Recently completed airborne geophysical surveys, including MobileMT in 20231 and high-resolution magnetics in 2024, suggest the possible presence of porphyry-related mineralization concealed by glacial tills within the broad alteration zone.  Historical shallow and sparse drilling in 1995 near the highest priority area intersected 67.1 meters of 0.18% copper (drill hole 95-5, Figure 2)2.  The percussion drill hole reportedly intersected potassically altered intrusive rocks with quartz veining, pyrite, chalcopyrite and molybdenite mineralization throughout its length, interpreted to represent mineralization proximal to a previously unknown porphyry center. 

The new soil geochemical results reported herein further demonstrate the strong prospectivity of the Poplar South target area as shown by the strong coincident soil geochemical responses of copper, molybdenum and silver over the main area of interest (Figures 3, 4 and 5). The main copper-in-soil anomaly (Figure 3) is approximately 1,200 meter long by 800 meter wide and contains values up to 1,200 ppm (0.12%) copper.

A total of 1,370 B-horizon soil samples were collected this summer over a 4.6 kilometer long portion of the alteration zone.  Samples were collected at 50 meter intervals along survey lines spaced 200 meter apart. 

The Project

The 44,200 hectare Poplar project in central BC covers Mesozoic aged arc-related volcanic, sedimentary and intrusive rocks considered prospective for porphyry-related copper and gold mineralization.  In addition to the Poplar South target area, the project also hosts the Poplar deposit, a near-surface porphyry-related copper and gold deposit, which contains close to 2 billion pounds of copper and 750,000 ounces of gold3 (indicated and inferred mineral resources, Table 1).  

The Next Steps

The Company is currently completing an IP geophysical survey across most of the Poplar South target area. The survey is designed to detect and characterize sulphide mineralization commonly present in porphyry-related mineral systems.  Results from the IP survey will be used to further refine a core drilling program planned for the first half of 2025.  The IP results will be reported once the survey is complete and the data are interpreted.

Table 1 – Historical Mineral Resource Estimate for the Poplar Deposit3

Class

Tonnes (Mt)

Grade

Metal

 

 

Cu (%)

Au (g/t)

Ag (g/t)

Cu (Mlbs)

Au (Koz)

Ag (Koz)

Indicated

152.3

0.32

0.09

2.58

1,091

430

12,640

Inferred

139.3

0.29

0.07

4.95

903

320

22,180

Notes:    *Above a cutoff of 0.2% Cu, ** source – see Reference 3 below

Figure 1 – Poplar Project

Figure 2 – Poplar South Target Area

Figure 3 – Copper in B-Horizon Soils at Poplar South

Figure 4 – Molybdenum in B-Horizon Soils at Poplar South

Figure 5 – Silver in B-Horizon Soils at Poplar South

About Vizsla Copper

Vizsla Copper is a Cu-Au-Mo focused mineral exploration and development company headquartered in Vancouver, Canada. The Company is primarily focused on its flagship Woodjam project, located within the prolific Quesnel Terrane, 55 kilometers east of the community of Williams Lake, British Columbia. It has three additional copper properties: Poplar, Copperview, and Redgold, all well situated amongst significant infrastructure in British Columbia. The Company’s growth strategy is focused on the exploration and development of its copper properties within its portfolio in addition to value accretive acquisitions. Vizsla Copper's vision is to be a responsible copper explorer and developer in the stable mining jurisdiction of British Columbia, Canada and it is committed to socially responsible exploration and development, working safely, ethically and with integrity.

Vizsla Copper is a spin-out of Vizsla Silver (TSX.V: VZLA) (NYSE: VZLA) and is backed by Inventa Capital Corp., a premier investment group founded in 2017 with the goal of discovering and funding opportunities in the resource sector. Additional information about the Company is available on SEDAR+ (www.sedarplus.ca) and the Company’s website (www.vizslacopper.com).

Qualified Person

The Company’s disclosure of technical or scientific information in this press release has been reviewed and approved by Christopher Leslie, Ph.D., P.Geo., Technical Advisor for Vizsla Copper.  Mr. Leslie is a Qualified Person as defined under the terms of National Instrument 43-101.  The historical Poplar mineral resource is considered relevant, as it was recently prepared for Universal Copper in 2021 using practices that are generally standard in the industry3.  It was created with ordinary kriging of composited grades into a 3D block model.  An independent qualified person has not done sufficient work to classify the Poplar historical estimate as a current mineral resource for Vizsla Copper Corp. and therefore, the issuer is not treating the historical estimate as a current mineral resource.

References

  1. Henneberry, T.R. (2024), Data acquisition and processing report, Helicopter Borne MobileMT Electromagnetic and Magnetic Survey, Assessment Report Indexing System, Report 41614, https://apps.nrs.gov.bc.ca/pub/aris
  2. Wagner, D. (1995), Soil sampling and percussion drilling on the Thira Property, Omineca Mining District, BC, Assessment Report Indexing System, Report 24109, https://apps.nrs.gov.bc.ca/pub/aris
  3. Ashton, P.E. and Robb, W. (2021), Technical Report 2021 Update on the Poplar Deposit, Omineca Mining Division British Columbia, https://sedarplus.ca

 

Contact Information: For more information and to sign-up to the mailing list, please contact:

Craig Parry, Executive Chairman, Chief Executive Officer

Tel: (604) 364-2215 | Email: info@vizslacopper.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD LOOKING STATEMENTS

The information contained herein contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: obtaining required regulator approvals for the Copperview Acquisition and the RG Copper Acquisition; satisfying the requirements of the Underlying Option Agreement; the exploration and development of the Poplar Project, Woodjam Project, Redgold Project and Copperview Project; and the Company’s growth and business strategies.

Such forward-looking information and statements are based on numerous assumptions, including among others, that the results of planned exploration activities are as anticipated, the anticipated cost of planned exploration activities, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms, that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company’s planned exploration activities will be available on reasonable terms and in a timely manner. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.

Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual events or results in future periods to differ materially from any projections of future events or results expressed or implied by such forward-looking information or statements, including, among others: negative operating cash flow and dependence on third party financing, uncertainty of additional financing, no known mineral reserves or resources, the limited operating history of the Company, the influence of a large shareholder, aboriginal title and consultation issues, reliance on key management and other personnel, actual results of exploration activities being different than anticipated, changes in exploration programs based upon results, availability of third party contractors, availability of equipment and supplies, failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated with the mineral exploration industry, environmental risks, changes in laws and regulations, community relations and delays in obtaining governmental or other approvals.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.  The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

Explore Vizsla Copper

Palmer VMS Project

Explore Vizsla Copper’s flagship project in Southeast Alaska

Poplar Project

Explore Vizsla Copper’s copper-gold porphyry project in British Columbia

Investors

Access the latest presentation, news, and investor materials

COPPERVIEW PROJECT

Notes on Mineral Resource Estimate

Please advise on Copperview Disclaimers. Or we can remove the link to this content.

WOODJAM PROJECT

Notes on Woodjam Historical Estimates

The Woodjam estimates are historical estimates within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The historical estimates are not being treated by Vizsla Copper as current mineral resources or mineral reserves. A Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

The historical estimates relate to the Southeast, Deerhorn and Takom deposits and were prepared for Gold Fields Horsefly Exploration Corp. and Consolidated Woodjam Copper Corp. with an effective date of May 15, 2013.

The Southeast historical estimate was disclosed in the technical report titled NI 43-101 Technical Report for 2012 Activities on the Woodjam South Property, Cariboo Mining Division, British Columbia, prepared by Ross Sherlock, Ph.D., P.Geo., Gold Fields Canada Exploration BV, and Alex Trueman, P.Geo., MAusIMM CP(Geo), Gold Fields Exploration, Inc., with an effective date of May 15, 2013. The Southeast historical estimate was completed by Alex Trueman, P.Geo., MAusIMM CP(Geo), Chief Resource Geologist, Gold Fields Exploration Inc.

The Deerhorn and Takom historical estimates were disclosed in the technical report titled NI 43-101 Technical Report for 2012 Activities on the Woodjam North Property, Cariboo Mining Division, British Columbia, prepared by Ross Sherlock, Ph.D., P.Geo., Gold Fields Canada Exploration BV, Jacqueline Blackwell, Ph.D., P.Geo., Gold Fields Canada Exploration BV, and Twila Skinner, P.Geo., Gold Fields Canada Exploration BV, with an effective date of May 15, 2013. The Deerhorn and Takom historical estimates were completed by Brian Wolfe, MAIG, Principal Resource Geologist, Gold Fields Australasia Pty. Ltd.

The Southeast and Deerhorn historical estimates were prepared using localized multivariate uniform conditioning, and the Takom historical estimate was prepared using ordinary kriging. Each historical estimate used a cut-off grade of US$8.60/t. The NSR calculation used metal price assumptions of US$1,650/oz Au and US$3.90/lb Cu and recovery assumptions of 69% Au and 85% Cu. The historical estimates were reported within modelled open pit shells based on price assumptions of US$1,650/oz Au and US$3.90/lb Cu.

Vizsla Copper considers the historical estimates relevant because they provide information regarding mineralization identified at the Woodjam Project and assist in guiding exploration planning. Vizsla Copper considers the historical estimates reliable for these limited purposes because they were prepared by qualified professionals using drilling and sampling information collected using modern methods available at the time. However, Vizsla Copper has not independently verified the historical estimates and readers should not rely on them as current mineral resources or mineral reserves.

Additional work required to verify or upgrade the historical estimates as current mineral resources may include, as applicable, data compilation, confirmation drilling, resampling, data verification, verification of historical drill hole locations and survey data, review and validation of historical QA/QC data, density verification, updated geological modelling, a site visit by a Qualified Person and preparation of a current mineral resource estimate and technical report in accordance with NI 43-101.

A Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves, and Vizsla Copper is not treating the historical estimates as current mineral resources or mineral reserves. There can be no assurance that the historical estimates, in whole or in part, will ever be verified as current mineral resources or converted into mineral reserves.

POPLAR PROJECT

Notes on Poplar Historical Estimate

The Poplar estimate is a historical estimate within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The historical estimate is based on the technical report titled Technical Report 2021 Update on the Poplar Deposit, Omineca Mining Division, British Columbia, prepared for Universal Copper Ltd. by James Ashton, P.E., SME-RM and Warren Robb, P.Geo., with a report date of September 2, 2021 and filed under Universal Copper Ltd.’s profile on SEDAR on September 8, 2021.

The historical estimate was reported at a 0.20% Cu cut-off within a modelled mineralized solid. The historical estimate comprises 152.3 million tonnes grading 0.32% Cu, 0.009% Mo, 0.09 g/t Au and 2.58 g/t Ag in the indicated category, and 139.3 million tonnes grading 0.29% Cu, 0.005% Mo, 0.07 g/t Au and 4.95 g/t Ag in the inferred category.

The historical estimate was prepared using a three-dimensional solid to constrain the interpolation of mineralization, using a 0.1% Cu grade limit as a guide. Large internal waste zones and certain post-mineral dykes were modelled. A total of 133 drill holes totaling 38,854 metres within the modelled area were used in the estimate. Copper, molybdenum, gold and silver assays within the mineralized solid were capped at 1.8% Cu, 0.16% Mo, 0.80 g/t Au and 70 g/t Ag, respectively. Five-metre composites were calculated and used for variography. Blocks were 5 m x 5 m x 10 m and were estimated for Cu, Mo, Au and Ag by ordinary kriging. Classification as indicated or inferred was based on each block’s proximity to data and grade continuity within the mineralized solid.

Vizsla Copper considers the historical estimate to be relevant because it provides information regarding the scale and grade of mineralization identified at the Poplar Project and assists in guiding future exploration and evaluation work. Vizsla Copper considers the historical estimate to be reliable for these limited purposes because it was prepared by qualified professionals using drilling, sampling and geological information available at the time and estimation methods considered reasonable when the estimate was prepared. However, Vizsla Copper has not independently verified the historical estimate and it should not be relied upon as a current mineral resource or mineral reserve.

The historical estimate used the categories “indicated” and “inferred”. These categories appear to be generally consistent with the corresponding mineral resource categories under NI 43-101 and the CIM Definition Standards; however, Vizsla Copper has not completed the work required to verify the historical estimate as a current mineral resource.

Additional work required to verify or upgrade the historical estimate as a current mineral resource may include, as applicable, confirmation drilling, verification of historical drill hole locations and survey data, validation of the drill hole database, review and validation of historical QA/QC data, density verification, metallurgical test work, updated geological modelling, application of current CIM Definition Standards and preparation of a current mineral resource estimate and technical report in accordance with NI 43-101.

A Qualified Person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves, and Vizsla Copper is not treating the historical estimate as current mineral resources or mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

PALMER PROJECT

Notes on Mineral Resource Estimate

(1) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The deposits have been classified as Indicated and Inferred based on confidence in the geological model, drill spacing. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The quantity and grade of reported Inferred Resources are uncertain in nature and there has not been sufficient work to define these Inferred Mineral Resources as Indicated or Measured Resources. There is no certainty that any part of a Mineral Resource will ever be converted into reserves.

(2) Mineral resources are reported using an assumed NSR which includes prices, recoveries and payabilities cut-off grade based on metal price assumptions*, variable metallurgical recovery assumptions**, mining costs, processing costs, general and administrative (G&A) costs and variable NSR factors. Mining (US$41.3), processing (US$23.92) and G&A costs (US$11.77) and Sustaining Capital (US$15.92) totaling US$92.9/t for Underground Mining.

(*) Metal price assumptions considered for the calculation of Metal Equivalent grades are: Gold (US$/oz 2,100.00), Silver (US$/oz 28.0), Copper (US$/lb 4.50), Lead (US$/lb 0.95) and Zinc (US$/lb 1.50)

(**) Cut-off grade calculations assume variable metallurgical recoveries as a function of grade and relative metal distribution. Average metallurgical recoveries are: SW/RW Zones: Gold (76.1%), Silver (90.2%), Copper (90.3%), Lead (82.9%) and Zinc (89.2%), AG Zone: Gold (66.0%), Silver (91.0%), Copper (54.8%), Lead (83.4%) and Zinc (94.8%) .

(3) NSR Calculations for SW/RW Domains: NSR= $77.25 x %Cu + $20.32 x %Zn + $9.64 x %Pb + $0.64 x g/t Ag + $43.07 x g/t Au

(4) NSR Calculation for AG Domain: NSR=$49.04 x %Cu + $22.25 x %Zn + $10.14 x %Pb + $0.70 x g/t Ag + $37.77 x g/t Au

(5) The resources are considered to have potential for extraction using underground methodology and constrained by mineable shapes. Resources are presented undiluted and in situ and are considered to have reasonable prospects for economic extraction.

(6) Barite as reported is shown for economic potential but has not been used in the NSR value at this stage.

(7) ZnEq defined by equation SW & RW = NSR value per block / $20.32; AG = NSR value per block / $22.25 (Note Barite has been excluded from the ZnEq and NSR calculations)

(8) CuEq defined by equation SW & RW = NSR value per block / $77.25; AG = NSR value per block / $49.04 (Note Barite has been excluded from the CuEq and NSR calculations)

(9) Mineral Resources are based on validated data, which have been subjected to QA/QC analysis, using capped, composited samples at 2m. Estimation has been completed using a combination of Ordinary Kriging and Inverse Distance estimation methodologies and classified based on confidence in the underlying data and drill spacing. Mineral resource tonnages have been rounded to reflect the precision of the estimate.

(10) The mineral resources were estimated by Benjamin Parsons, BSc , MSc Geology, MAusIMM (CP) #222568 of SRK, a Qualified Person.