May 16, 2024

Vizsla Copper Provides Corporate Update and Poplar Copper-Gold Project Strategy Update

Vancouver, British Columbia, May 16, 2024 – Vizsla Copper Corp. (TSX.V: VCU, OTCQB: VCUFF) (“Vizsla Copper” or the “Company”) is pleased to announce the appointment of Craig Parry, Executive Chairman, to the role of Chief Executive Officer (“CEO”), and further information on the newly acquired Poplar Project (“Poplar” or the “Project”).  The Poplar Project is home to the Poplar Deposit (the “Deposit”), a large porphyry-related copper-gold-molybdenum deposit that is one of the most advanced pre-production copper projects in British Columbia.

HIGHLIGHTS:

  • CEO. Craig Parry, Executive Chairman, has assumed the role of CEO.
  • Large, Gold-Rich Resource Base. The Project hosts a current undiluted indicated mineral resource of 152.3 million tonnes grading 0.32% copper, 0.009% molybdenum, 0.09 g/t gold and 2.58 g/t silver and an undiluted inferred mineral resource of 139.3 million tonnes grading 0.29% copper, 0.005% molybdenum, 0.07 g/t gold and 4.95 g/t silver.
  • Development Potential. The Poplar Deposit is a large, near-surface copper deposit that extends to the top of the bedrock and is covered only by a thin veneer (5-10m thick) of overburden.  It possesses a higher-grade core that also extends to the top of the bedrock and may be beneficial to phased mining scenarios.
  • Exploration Potential. Very little exploration drilling or ground geophysical surveying has been completed outside of the immediate Poplar deposit area, suggesting terrific potential for the discovery of additional porphyry-related mineralization.  

“With the completion of the Universal Copper transaction, I look forward to taking a more active role in the Company’s day-to-day operations” stated Craig Parry, Executive Chairman of the Company.  “Since Vizsla Copper’s inception, we’ve succeeded in adding multiple exciting development and exploration assets, and we’re just getting started.  Vizsla Copper is in a terrific position with the price of copper approaching $5 per pound and strong tailwinds continuing to dominate the sector.”

“Now that we’ve had a chance to absorb and reflect on the exploration data from the Poplar Project, I’m very impressed by the development potential and exploration opportunity it provides” commented Steve Blower, Vice President, Exploration of the Company. “With a significant precious metal component, large size and location essentially at surface, this deposit is impressive.” 

MANAGEMENT CHANGE

With the continuing evolution of the Company, Mr. Craig Parry has assumed the role of CEO and will remain Chair of the Company’s Board of Directors.  Craig brings a track record of creating shareholder value in previous CEO roles.  Most recently, in his role as CEO of IsoEnergy, he turned an early-stage exploration spinout company into a much larger discovery success story in the uranium space.  Mr. Chris Donaldson, remaining as a director of the Company, will step down as CEO effective immediately so that he can devote more time to other pursuits. The Company is appreciative of Chris’s efforts as the former CEO.

POPLAR PROJECT

The 39,000-hectare Poplar Project hosts a porphyry-related copper and gold deposit, the Poplar Deposit (Figures 1 and 2).  The top 10 historical drill hole intersections (>0.2% Cu) in the Poplar Deposit, ranked by Grade*Length (%Cu*m) are provided in Table 1.  The top ranked drill hole was recently completed in 2021 by Universal Copper.  Drill hole 21-PC-131 intersected 432.8m @ 0.42% Cu, 0.011% Mo, 0.15 g/t Au and 1.80 g/t Ag (0.58% Cueq1,2) from 2.2m.  Figure 3 shows the extent of copper mineralization in plan view at the Poplar deposit and demonstrates, and Figure 4 shows it on a vertical longitudinal section. 

The Poplar Deposit has a historical indicated mineral resource of 152.3 million tonnes grading 0.32% copper, 0.009% molybdenum, 0.09 g/t gold and 2.58 g/t silver and a historical inferred mineral resource of 139.3 million tonnes grading 0.29% copper, 0.005% molybdenum, 0.07 g/t gold and 4.95 g/t silver (above a cut-off grade of 0.20% copper).  The historical mineral resource estimate was prepared for Universal Copper in September, 2021.  It is not being treated as a current Mineral Resource Estimate, as the Company has not yet had it verified by an Independent Qualified Person.  However, the recent date of the Universal estimate and the lack of drilling completed since that date suggests that the historical estimate is relevant.  Readers are cautioned that mineral resources, which are not mineral reserves, do not have demonstrated economic viability.

The Poplar Project is located in mining country, 35km from the Huckleberry Copper Mine. The road accessible property is bisected by a 138 Kva hydroelectric line and lies 88km from the rail head at Houston and 400km from the deep-water port at Prince Rupert by rail.

Table 1 – Top 10 Poplar Deposit Drill Hole Intersections (>0.2% Cu) Ranked by Cu%*m

Rank

Hole ID

From (m)

To (m)

Length (m)

Cu %

Mo %

Au g/t

Ag g/t

CuEq %

Cu*L (%*m)

1

21-PC-131

2.20

435.00

432.80

0.42

0.011

0.15

1.80

0.58

183.32

 

incl.

156.00

192.00

36.00

0.66

0.012

0.28

1.23

0.90

 

 

incl.

242.00

270.00

28.00

0.67

0.012

0.27

3.41

0.92

 

2

21-PC-133

21.25

423.50

402.25

0.43

0.014

0.13

3.07

0.60

174.12

 

incl.

253.25

294.50

41.25

0.94

0.018

0.23

4.06

1.19

 

3

19-PC-129

149.00

527.65

378.65

0.42

0.014

0.13

2.22

0.58

160.78

 

incl.

397.00

452.82

55.82

0.54

0.019

0.14

2.18

0.72

 

 

incl.

286.00

312.56

26.56

0.57

0.006

0.18

3.40

0.74

 

4

11-PC-88

11.79

361.00

349.21

0.41

0.020

0.12

2.62

0.59

143.92

 

incl.

232.98

280.98

48.00

0.62

0.011

0.18

2.35

0.79

 

 

incl.

166.98

187.98

21.00

0.55

0.018

0.15

1.21

0.73

 

5

18-PC-126

23.50

404.47

380.97

0.36

0.015

0.10

2.30

0.51

138.57

6

11-PC-84

24.99

402.88

377.89

0.36

0.012

0.10

1.74

0.48

134.85

7

11-PC-99

53.60

420.59

366.99

0.37

0.022

0.12

2.30

0.55

134.45

 

incl.

340.57

379.57

39.00

0.69

0.036

0.31

0.89

1.03

 

8

PC-65

24.40

315.00

290.60

0.39

0.015

0.00

0.53

0.45

113.32

 

incl.

36.00

78.00

42.00

0.58

0.005

0.01

0.76

0.61

 

9

PC-01

0.61

300.84

300.23

0.37

0.022

0.02

0.30

0.47

112.47

10

18-PC-127

8.50

270.36

261.86

0.42

0.013

0.11

2.66

0.56

110.97

 

incl.

51.00

78.00

27.00

0.64

0.030

0.15

2.63

0.87

 

Notes:

  1. Composite intervals are calculated above 0.2% Cu (above 0.5% Cu for the included sub-intervals) and may include a maximum of 10m of internal waste,
  2. Copper equivalent values are based on metal prices of $4.00/lb Cu, $1,800/oz Au, $22/oz Ag and $15/lb Mo and an assumed 100% recovery.

 

DEVELOPMENT STRATEGY

The Company will be updating the Mineral Resource Estimate for the Poplar Deposit to bring it up to current status.  This will provide important inputs to planned internal scoping level trade-off studies which will be used to rank and prioritize development scenarios amongst the various projects and deposits within the Company.  The results of the internal scoping studies will determine the path forward for a Preliminary Economic Analysis.

Figure 1 – Poplar Project Location Map

Figure 2 – Poplar Project Map

Figure 3 – Poplar Deposit Level Plan (700masl) (Drill hole traces projected in their entirety)

Figure 4 – Poplar Deposit Vertical Longitudinal Section (Section Line on Figure 3)

STOCK OPTIONS AND AMENDED STOCK OPTION PLAN

The Company’s board of directors have approved amendments to its current 10% Rolling Stock Option Plan (the “Plan”), originally adopted on September 20, 2021 to comply with the recent changes to the TSX Venture Exchange (the “TSXV”) Policy 4.4 – Security Based Compensation.  The amendments have been conditionally approved by the TSXV and are subject to shareholder ratification at the Company’s next annual general meeting later this year.  

The Company has granted a total of 7,500,000 stock options (the “Options”) to directors, officers, employees and consultants of the Company.  The Options will have an exercise price of $0.09, expire five years from the date of grant and shall vest over two years.  The Options were granted pursuant to the Plan and are subject to regulatory approval.

QUALIFIED PERSON

The disclosure of technical or scientific information in this press release has been reviewed and approved by Ian Borg, P.Geo., Senior Geologist for Vizsla Copper. Mr. Borg is a Qualified Person as defined under the terms of National Instrument 43-101.

ABOUT VIZSLA COPPER

Vizsla Copper is a Cu-Au-Mo focused mineral exploration and development company headquartered in Vancouver, Canada. The Company is primarily focused on its flagship Woodjam project, located within the prolific Quesnel Terrane, 55 kilometers east of the community of Williams Lake, British Columbia. It has three additional copper exploration properties: Copperview, Redgold and Carruthers Pass, all well situated amongst significant infrastructure in British Columbia. Following closing of the Arrangement, Vizsla Copper will control a fifth project, the Poplar Project. The Company’s growth strategy is focused on the exploration and development of its copper properties within its portfolio in addition to value accretive acquisitions. Vizsla Copper's vision is to be a responsible copper explorer and developer in the stable mining jurisdiction of British Columbia, Canada and it is committed to socially responsible exploration and development, working safely, ethically and with integrity.

 

CONTACT INFORMATION

For more information and to sign-up to the mailing list, please contact:

Craig Parry, Chief Executive Officer and Chairman

Tel: (604) 364-2215 | Email:info@vizslacopper.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD LOOKING STATEMENTS

This news release contains forward-looking statements or forward-looking information relating to the future operations of the Company and other statements that are not historical facts. Forward-looking statements in this news release include but are not limited to: obtaining the necessary approvals required for the Arrangement; completion of the Arrangement and the timing thereof; the benefits of the Arrangement; exploration activities; and Vizsla Copper’s growth and business strategies.

Forward-looking statements are based on the reasonable assumptions, estimates, analyses and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. Management believes that the assumptions and expectations reflected in such forward-looking statements are reasonable. Assumptions have been made regarding, among other things: the Company’s ability to carry on exploration and development activities; the timely receipt of required approvals; the price of copper and other metals; and the Company’s ability to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used.

Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results to be materially different from those expressed or implied by such forward-looking statements. Such risks, uncertainties and other factors include but are not limited to: the Company’s early stage of development and lack of history as a stand-alone entity; the fluctuation of the price of copper and other metals; the availability of additional funding as and when required; the speculative nature of mineral exploration and development; the timing and ability to maintain and, where necessary, obtain necessary permits and licenses; the uncertainty in geologic, hydrological, metallurgical and geotechnical studies and opinions; infrastructure risks, including access to water and power; environmental risks and hazards; risks associated with negative operating cash flow; and risks associated with dilution. For a further discussion of risks relevant to the Company, see the Company’s other public disclosure documents.

Although management has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There is no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such forward-looking statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statements, except as, and to the extent required by, applicable securities laws.

 

Explore Vizsla Copper

Palmer VMS Project

Explore Vizsla Copper’s flagship project in Southeast Alaska

Poplar Project

Explore Vizsla Copper’s copper-gold porphyry project in British Columbia

Investors

Access the latest presentation, news, and investor materials

COPPERVIEW PROJECT

Notes on Mineral Resource Estimate

Please advise on Copperview Disclaimers. Or we can remove the link to this content.

WOODJAM PROJECT

Notes on Woodjam Historical Estimates

The Woodjam estimates are historical estimates within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The historical estimates are not being treated by Vizsla Copper as current mineral resources or mineral reserves. A Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

The historical estimates relate to the Southeast, Deerhorn and Takom deposits and were prepared for Gold Fields Horsefly Exploration Corp. and Consolidated Woodjam Copper Corp. with an effective date of May 15, 2013.

The Southeast historical estimate was disclosed in the technical report titled NI 43-101 Technical Report for 2012 Activities on the Woodjam South Property, Cariboo Mining Division, British Columbia, prepared by Ross Sherlock, Ph.D., P.Geo., Gold Fields Canada Exploration BV, and Alex Trueman, P.Geo., MAusIMM CP(Geo), Gold Fields Exploration, Inc., with an effective date of May 15, 2013. The Southeast historical estimate was completed by Alex Trueman, P.Geo., MAusIMM CP(Geo), Chief Resource Geologist, Gold Fields Exploration Inc.

The Deerhorn and Takom historical estimates were disclosed in the technical report titled NI 43-101 Technical Report for 2012 Activities on the Woodjam North Property, Cariboo Mining Division, British Columbia, prepared by Ross Sherlock, Ph.D., P.Geo., Gold Fields Canada Exploration BV, Jacqueline Blackwell, Ph.D., P.Geo., Gold Fields Canada Exploration BV, and Twila Skinner, P.Geo., Gold Fields Canada Exploration BV, with an effective date of May 15, 2013. The Deerhorn and Takom historical estimates were completed by Brian Wolfe, MAIG, Principal Resource Geologist, Gold Fields Australasia Pty. Ltd.

The Southeast and Deerhorn historical estimates were prepared using localized multivariate uniform conditioning, and the Takom historical estimate was prepared using ordinary kriging. Each historical estimate used a cut-off grade of US$8.60/t. The NSR calculation used metal price assumptions of US$1,650/oz Au and US$3.90/lb Cu and recovery assumptions of 69% Au and 85% Cu. The historical estimates were reported within modelled open pit shells based on price assumptions of US$1,650/oz Au and US$3.90/lb Cu.

Vizsla Copper considers the historical estimates relevant because they provide information regarding mineralization identified at the Woodjam Project and assist in guiding exploration planning. Vizsla Copper considers the historical estimates reliable for these limited purposes because they were prepared by qualified professionals using drilling and sampling information collected using modern methods available at the time. However, Vizsla Copper has not independently verified the historical estimates and readers should not rely on them as current mineral resources or mineral reserves.

Additional work required to verify or upgrade the historical estimates as current mineral resources may include, as applicable, data compilation, confirmation drilling, resampling, data verification, verification of historical drill hole locations and survey data, review and validation of historical QA/QC data, density verification, updated geological modelling, a site visit by a Qualified Person and preparation of a current mineral resource estimate and technical report in accordance with NI 43-101.

A Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves, and Vizsla Copper is not treating the historical estimates as current mineral resources or mineral reserves. There can be no assurance that the historical estimates, in whole or in part, will ever be verified as current mineral resources or converted into mineral reserves.

POPLAR PROJECT

Notes on Poplar Historical Estimate

The Poplar estimate is a historical estimate within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The historical estimate is based on the technical report titled Technical Report 2021 Update on the Poplar Deposit, Omineca Mining Division, British Columbia, prepared for Universal Copper Ltd. by James Ashton, P.E., SME-RM and Warren Robb, P.Geo., with a report date of September 2, 2021 and filed under Universal Copper Ltd.’s profile on SEDAR on September 8, 2021.

The historical estimate was reported at a 0.20% Cu cut-off within a modelled mineralized solid. The historical estimate comprises 152.3 million tonnes grading 0.32% Cu, 0.009% Mo, 0.09 g/t Au and 2.58 g/t Ag in the indicated category, and 139.3 million tonnes grading 0.29% Cu, 0.005% Mo, 0.07 g/t Au and 4.95 g/t Ag in the inferred category.

The historical estimate was prepared using a three-dimensional solid to constrain the interpolation of mineralization, using a 0.1% Cu grade limit as a guide. Large internal waste zones and certain post-mineral dykes were modelled. A total of 133 drill holes totaling 38,854 metres within the modelled area were used in the estimate. Copper, molybdenum, gold and silver assays within the mineralized solid were capped at 1.8% Cu, 0.16% Mo, 0.80 g/t Au and 70 g/t Ag, respectively. Five-metre composites were calculated and used for variography. Blocks were 5 m x 5 m x 10 m and were estimated for Cu, Mo, Au and Ag by ordinary kriging. Classification as indicated or inferred was based on each block’s proximity to data and grade continuity within the mineralized solid.

Vizsla Copper considers the historical estimate to be relevant because it provides information regarding the scale and grade of mineralization identified at the Poplar Project and assists in guiding future exploration and evaluation work. Vizsla Copper considers the historical estimate to be reliable for these limited purposes because it was prepared by qualified professionals using drilling, sampling and geological information available at the time and estimation methods considered reasonable when the estimate was prepared. However, Vizsla Copper has not independently verified the historical estimate and it should not be relied upon as a current mineral resource or mineral reserve.

The historical estimate used the categories “indicated” and “inferred”. These categories appear to be generally consistent with the corresponding mineral resource categories under NI 43-101 and the CIM Definition Standards; however, Vizsla Copper has not completed the work required to verify the historical estimate as a current mineral resource.

Additional work required to verify or upgrade the historical estimate as a current mineral resource may include, as applicable, confirmation drilling, verification of historical drill hole locations and survey data, validation of the drill hole database, review and validation of historical QA/QC data, density verification, metallurgical test work, updated geological modelling, application of current CIM Definition Standards and preparation of a current mineral resource estimate and technical report in accordance with NI 43-101.

A Qualified Person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves, and Vizsla Copper is not treating the historical estimate as current mineral resources or mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

PALMER PROJECT

Notes on Mineral Resource Estimate

(1) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The deposits have been classified as Indicated and Inferred based on confidence in the geological model, drill spacing. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The quantity and grade of reported Inferred Resources are uncertain in nature and there has not been sufficient work to define these Inferred Mineral Resources as Indicated or Measured Resources. There is no certainty that any part of a Mineral Resource will ever be converted into reserves.

(2) Mineral resources are reported using an assumed NSR which includes prices, recoveries and payabilities cut-off grade based on metal price assumptions*, variable metallurgical recovery assumptions**, mining costs, processing costs, general and administrative (G&A) costs and variable NSR factors. Mining (US$41.3), processing (US$23.92) and G&A costs (US$11.77) and Sustaining Capital (US$15.92) totaling US$92.9/t for Underground Mining.

(*) Metal price assumptions considered for the calculation of Metal Equivalent grades are: Gold (US$/oz 2,100.00), Silver (US$/oz 28.0), Copper (US$/lb 4.50), Lead (US$/lb 0.95) and Zinc (US$/lb 1.50)

(**) Cut-off grade calculations assume variable metallurgical recoveries as a function of grade and relative metal distribution. Average metallurgical recoveries are: SW/RW Zones: Gold (76.1%), Silver (90.2%), Copper (90.3%), Lead (82.9%) and Zinc (89.2%), AG Zone: Gold (66.0%), Silver (91.0%), Copper (54.8%), Lead (83.4%) and Zinc (94.8%) .

(3) NSR Calculations for SW/RW Domains: NSR= $77.25 x %Cu + $20.32 x %Zn + $9.64 x %Pb + $0.64 x g/t Ag + $43.07 x g/t Au

(4) NSR Calculation for AG Domain: NSR=$49.04 x %Cu + $22.25 x %Zn + $10.14 x %Pb + $0.70 x g/t Ag + $37.77 x g/t Au

(5) The resources are considered to have potential for extraction using underground methodology and constrained by mineable shapes. Resources are presented undiluted and in situ and are considered to have reasonable prospects for economic extraction.

(6) Barite as reported is shown for economic potential but has not been used in the NSR value at this stage.

(7) ZnEq defined by equation SW & RW = NSR value per block / $20.32; AG = NSR value per block / $22.25 (Note Barite has been excluded from the ZnEq and NSR calculations)

(8) CuEq defined by equation SW & RW = NSR value per block / $77.25; AG = NSR value per block / $49.04 (Note Barite has been excluded from the CuEq and NSR calculations)

(9) Mineral Resources are based on validated data, which have been subjected to QA/QC analysis, using capped, composited samples at 2m. Estimation has been completed using a combination of Ordinary Kriging and Inverse Distance estimation methodologies and classified based on confidence in the underlying data and drill spacing. Mineral resource tonnages have been rounded to reflect the precision of the estimate.

(10) The mineral resources were estimated by Benjamin Parsons, BSc , MSc Geology, MAusIMM (CP) #222568 of SRK, a Qualified Person.